The contractor for the City of #Kirksville, Jonathan Reiff Construction, will begin work on a sidewalk brick band replacement project in the Central Business District – or Downtown area – on August 23rd. The project will consist of removing the old brick pavers and replacing them with colored concrete in a stamped brick pattern. Sidewalks may be temporarily closed while the brick bands are replaced. However, access to businesses will be maintained throughout the project. The project area includes the west side of the 100 block of South Franklin Street, 100 block of East McPherson Street, the 100 block of South Marion Street, the 200 block of North Main Street, the 100 block of South Main Street, and various curb extensions on the Square.