Resurfacing of Route 59 to begin

A project to resurface portions of U.S. Route 59 is scheduled to begin Monday, Sept. 9. Herzog Contracting Corp., working with the Missouri Department of Transportation, will resurface the first portion of Route 59 from the intersection of Missouri Route 46 near Fairfax in Atchison County to the intersection of Holt County Route O near Oregon. Crews will begin work near Fairfax and work toward Oregon. During construction, the roadway will be narrowed to one lane with flaggers and a pilot car guiding motorists through the work zone from 6 a.m. – 7 p.m. Monday through Saturday. A 10-foot width restriction will be in place. These routes are planned to be resurfaced by November 2024.