KIRX News

Bridge work begins Feb. 2

MoDOT Northeast District says Weather permitting, bridge rehabilitation work is scheduled to begin as early as Feb. 2 in the EB and WB lanes of U.S. 36 and at the U.S. 63/36 interchange in Macon Co. Traffic will be reduced to one lane with a 10-foot width restrictions at the following locations:
· U.S. 36 (EB and WB)
○ Bridge over Gantz St. in Macon
○ Bridge over Long Branch Lake Rd., just west of Macon
○ Underneath U.S. 63/36 interchange bridge in Macon
· U.S. 63 (NB and SB) – at the U.S. 63/36 interchange bridge in Macon
See link for details: www.modot.org/node/82434

Exit mobile version