Weather permitting, as early as October 27, resurfacing repair work is scheduled to begin on Route F in Marion County, from Route E at Woodland to 0.2 mile west of U.S. Route 61 near Palmyra. Traffic will be reduced to one lane with a 10-foot width restriction at the location where crews are actively working. Flaggers and a pilot car will be utilized for traffic control to guide traffic through the work zone. All work is weather dependent and schedules are subject to change.